title: "Stating a determinism budget for a control loop"
tldr: "Before writing loop code, fix four numbers: sample rate, allowed jitter on the sampling instant, worst-case actuation latency, and the deadline-miss policy. Every downstream choice then checks against the budget."
type: "reference"
hub: "Control Systems"
published: "2026-09-03"
updated: "2026-09-03"
canonical: "https://exubits.com/engineering/stating-a-determinism-budget"
author: "Exubits Engineering"
---

# Stating a determinism budget for a control loop

> Before writing loop code, fix four numbers: sample rate, allowed jitter on the sampling instant, worst-case actuation latency, and the deadline-miss policy. Every downstream choice then checks against the budget.

Most real-time control problems are argued in adjectives — "fast enough",
"low jitter", "hard real-time" — and adjectives cannot be verified. A determinism
budget replaces them with four numbers agreed before implementation starts. After
that, every architectural question has a right answer: does option A fit inside
the budget or not.

This page is about writing that budget. It is protocol- and silicon-agnostic on
purpose; the numbers change per project, the structure does not.

## The four numbers

### 1. Sample rate (`f_s`)

The rate at which the loop reads its inputs and updates its output. Set it from
the plant, not from what the CPU can do:

- **Rule of thumb**: `f_s` between 10× and 20× the closed-loop bandwidth you
  need. Below 10× the phase lag from sampling eats your phase margin; far above
  20× you are burning CPU and amplifying sensor noise through the derivative term
  for no dynamic benefit.
- For a mechanical position loop with a 50 Hz bandwidth target, that is roughly
  1–2 kHz. For a motor current loop it is typically 8–20 kHz because the
  electrical time constant is short. For a temperature loop, 1–10 Hz is often
  plenty and a faster loop just wastes power.
- Write down the reasoning, not just the number. The next engineer needs to know
  whether 2 kHz was a plant requirement or a guess.

### 2. Sampling jitter (`Δt_s`)

The allowed variation in *when* the input is actually sampled, relative to the
ideal period `1/f_s`. This is the number most specs omit and most loops get bitten
by.

Jitter matters because a control law assumes a fixed `Δt`. If the real interval
wanders by ±15% and the code still divides by the nominal `Δt` in the derivative
and integral terms, you have injected a disturbance proportional to the jitter and
the signal slew rate. Effects:

- The `I` term accumulates the wrong area.
- The `D` term produces spikes on jittered intervals.
- At the control-bandwidth frequency, timing jitter aliases into the loop as
  broadband noise you cannot filter out without also hurting the response.

Budget it as a percentage of the period and as an absolute time. "≤ 2% of period
or ≤ 5 µs, whichever is larger" is a typical starting point for a mid-rate loop.
For a current loop synchronised to PWM, the sampling instant is usually locked to
a timer/PWM trigger and an ADC hardware trigger, and the jitter budget there is
tens of nanoseconds — a software-timer-driven sample cannot meet it and the
budget is what tells you that up front.

Two mitigations worth stating in the budget itself:

- **Timestamp every sample** and feed the *actual* `Δt` into the loop maths, so
  jitter degrades gracefully instead of injecting noise.
- **Trigger sampling in hardware** (timer-to-ADC, no CPU in the path) and let the
  ISR only *consume* the result.

### 3. Worst-case actuation latency (`L_wc`)

The time from "the sampling instant" to "the new actuator command is in effect" —
end to end, worst case, not typical. Its components:

```
L_wc = t_acq        ADC conversion + settling
     + t_dispatch   interrupt latency + scheduler to the loop task
     + t_compute    the control law, worst-case path
     + t_output     DAC/PWM update, or the bus transaction to a remote drive
     + t_actuator   the actuator's own transport lag (often the biggest term)
```

Rules for filling it in:

- Use **worst case** for every term. Interrupt latency under maximum interrupt
  load, `t_compute` with the branch that runs the anti-windup and the fault
  checks, bus latency including retransmission if the link allows it.
- `L_wc` shows up in the loop as pure dead time. Dead time destroys phase margin
  fast: as a guide, keep `L_wc` under about 1/10 of the loop period, and treat
  anything above 1/4 of the period as a redesign trigger.
- If the actuator is across a fieldbus, the bus cycle time and its determinism
  are now inside your control budget. A 1 kHz loop commanding a drive over a
  1 ms-cycle bus has spent its entire latency budget on transport before any
  control happens. This is the calculation that decides whether the loop runs
  local to the drive or on a central controller.

### 4. Deadline-miss policy

Define what a missed deadline *is* and what the system does about it. "It should
not happen" is not a policy.

- **What counts as a miss**: loop iteration N has not completed before iteration
  N+1's release. Instrument it — a GPIO toggled at loop start/end on a scope, or
  a software counter of overruns exported to diagnostics.
- **Allowed miss rate**: for a soft loop, "≤ 1 in 10⁶ iterations and never two
  consecutive" might be fine. For a loop tied to a safety function, the answer is
  usually zero within the safety analysis and the response is a defined safe
  state, not a retry.
- **The response**: hold last output, ramp to a safe value, trip a fault, or
  extrapolate one step. Each has failure modes — holding last output during a
  fast transient can be worse than a brief zero. State the choice and why.
- **Escalation**: what happens on the 2nd, 10th, 100th consecutive miss.

## What the budget lets you decide without arguing

Once the four numbers exist, these stop being opinions:

| Question | Decided by |
|---|---|
| Bare-metal, RTOS, or Linux with `PREEMPT_RT`? | Can its worst-case interrupt-to-task latency + scheduler jitter fit inside `Δt_s` and the `t_dispatch` share of `L_wc`, measured, under load? |
| Loop in an ISR or a task? | If `t_compute` is far below the period and the jitter budget is tight, use the ISR. If `t_compute` is a meaningful fraction of the period, use a task so it can be preempted by faster ISRs. |
| Control local to the actuator or central? | Does the bus transport lag fit inside `L_wc`? |
| Which fieldbus? | Its cycle time and cycle-time jitter versus `Δt_s` and `L_wc`. |
| Is this core allowed to run anything else? | Only if the other work's worst-case interference still leaves the budget intact — usually meaning a shielded/isolated core or a dedicated MCU. |

## Measuring against it

A budget you cannot measure is a wish. The standard instrumentation:

- **GPIO + scope/logic analyser**: toggle a pin at ISR entry, at loop-math start,
  at output write. Persistence mode on the scope shows the jitter envelope
  directly. This is the ground truth; trust it over any software timestamp.
- **Cycle counter** (`DWT->CYCCNT` on Cortex-M, `PMCCNTR` / `perf` on
  Cortex-A) around the compute path, logging min/max/histogram, not just mean.
- **Overrun counter** in the loop, exported to the same diagnostics channel as
  everything else so field units report it.
- **Soak under worst-case load**: every interrupt source firing, the comms stack
  saturated, the file system busy, cache cold. The typical case is not the
  number in the budget.

Hold the measurement for long enough to see the tail. Latency distributions in
real systems have long tails driven by rare cache/TLB/bus-contention events, and
the 99.99th percentile is often 3–10× the median. The budget is about the tail,
so the measurement has to reach it.

## The honest trade-off

Writing this budget costs a day or two of analysis and a negotiation with whoever
owns the plant requirements, before any loop code exists. On a schedule under
pressure that day is tempting to skip, and the loop will usually "work" on the
bench without it.

What you lose by skipping it is the ability to say *why* it works, and the ability
to catch — at design time rather than during integration — the cases where the
chosen bus or OS cannot meet the timing. Those cases are expensive exactly in
proportion to how late they are found. The budget moves that discovery to the
cheapest possible point.

A tighter budget is not free either. Driving jitter to nanoseconds means hardware
triggering, a shielded core, and no shared bus — real BOM and integration cost.
The budget should be as loose as the plant genuinely allows, and no looser.