Eight capabilities, one team

The integration between them is our job, not your risk.

The argument

Why span matters

Every embedded design house publishes a list like this one, so the list is not the argument. The argument is span: PCB, firmware, BSP, control and connectivity held by the same engineers, so a control-loop bug is a debugging session, not a negotiation between three suppliers.

When the board house, the firmware contractor and the BSP vendor are separate companies, you own the integration. The board blames the firmware, the firmware blames the BSP, and the schedule moves right by weeks while nobody is accountable. Holding the whole stack removes that seam.

Standards worked toThe standards a programme has to meet are agreed at the start and written into the scope — EMC and safety testing, sector requirements, and the evidence pack each one needs. The specific set for your programme, and the certificates we already hold, are shared on request.

Talk to an engineer

Bring a schematic, a requirement, or a problem you cannot place. A real engineer answers.