Engineering /All posts / V&V
V&V
Everything in the publication tagged V&V, newest first.
1post · page 1 of 1
What a production hand-over pack has to contain
It lets someone else build, test, certify and change the product without the original team: design data, a reproducible firmware build, factory tests with limits, the compliance file, an SBOM, and known issues.